Hamilton Field Levee/RDA/CFD

Information and Resources

 

The following information is provided to assist the public in reviewing documents related to the construction and testing that has been done to the levees at Hamilton Field.  This information is also available in a binder located both at City offices (75 Rowland Way) and at the Hamilton Field Library (6 Hamilton Landing, Suite 140A).

Hamilton Levee Documents

1

Geomatrix Consultants, Geotechnical Engineering Study — Hamilton Field Phase 1 Development, Novato, California, Volume 1, 12 June 1995a.

 

2

Geomatrix Consultants, Letter to Mr. Todd Wright (The New Hamilton Partnership) regarding "Response to HLA Review Comments, Hamilton Field Phase 1 Development, Novato, California", 2 October 1995b.

 

3

Geomatrix Consultants, "Flood Control Levee Inspection, Monitoring, and Maintenance Manual, Hamilton Field, Phase 1, Novato, CA" 21 February 1997.

 

4

Geomatrix Consultants, Emergency Response Plan — Flood Control Levee, Hamilton Field Phase 1, Novato, California 22 May 1997.

 

5

Geomatrix Consultants, Letter to Mr. Todd Wright (The New Hamilton Partnership) regarding "Construction of Flood Control Levee, Hamilton Field Phase 1, Novato, California", 11 March 1998a.

 

6

Geomatrix Consultants, Letter to Mr. Todd Wright (The New Hamilton Partnership) regarding "Evaluation of Effect of Placing Fill Against the Flood Control Levee, Hamilton Field Phase 1, Novato, California", 2 April 1998b.

 

7

URS, "Responses to Review Comments - Draft Report; New Hamilton Partnership Levee", Letter to U.S. Army Corps of Engineers, dated 19 August 2003. (Bound Separately) (Coming Soon)

8

URS, "Final Report: Geotechnical Investigation and Design Recommendations for the New Hamilton Partnership Levee, Hamilton Army Air Field, Wetlands Restoration Project", 30 April 2004. (Coming Soon)

9

URS/ARUP, "Final Report: Test Fill Construction, Monitoring, and Evaluation - Hamilton Wetlands Restoration Project - Part I: Performance During Construction", 19 September 2005a. (Coming Soon)

10

URS/ARUP, "Final Report: Test Fill Construction, Monitoring, and Evaluation — Part II: Performance After Construction — Six Month Monitoring Program — Hamilton Wetlands Restoration Project", December 2005b. (Coming Soon)

11

ARUP, "Final Report: Numerical Analysis of Proposed Revised Design of Seasonal Wetland Fill Along the Existing NHP Levee, Hamilton Wetlands Restoration Project", 6 March 2006.

 

12

Geomatrix Consultants, Letter to Mr. Glenn Young (City of Novato), "Geotechnical Peer Review, Test Fill Construction and Monitoring Program, Hamilton Wetlands Restoration Project, Novato, CA", 3 April 2006. (Coming Soon)

13

USACE, "Hamilton Wetlands Restoration Project — Project Information Report Engineering and Construction Adjacent to the Novato Public Finance Authority Levee (NPFA Levee)", 24 November 2008.

 

14

USACE, Letter to Mr. Glenn Young, "Seepage and Slope Stability Analysis", 18 December 2008.

 

15

Geosyntec Consultants, Letter to Mr. Jeffrey Walter (City Attorney, City of Novato) regarding "Evaluation of Levee Seepage Sources, Based on Review of Design and Construction Documents", February 5, 2009.

 

16

USACE, "Hamilton Wetlands Restoration Project — Project Information Report 2nd City of Novato Easement for Construction Adjacent to the Novato Public Finance Authority Levee (NPFA Levee)", 12 June 2009.

 

17

FEMA, "Letter of Map Revision (LOMR) for Areas Protected by New Hamilton Partnership (Hamilton) Levee, Case No.: 97-09-835P" 14 June 1997.

 

18

City of Novato, "Certification for Continued FEMA Accreditation for Hamilton Field Levee, Novato, CA" 8 August 2007.

 

19

FEMA, "7Accreditation of Certification for Hamilton Field Levee, Novato, CA" 26 September 2007.

 

20

USACE — www.hamiltonwetlands.org, "Hamilton Wetland Restoration Project, Background and History" 11 November 2009.

 

21

URS/ARUP, Report: "Pre-Construction/Baseline Survey Hamilton Wetlands Restoration Project, Novato, CA" 28 February 2007. (Coming Soon)

22

Not Used

23

CSW/Stuber-Stroeh Engineering Group Inc., Record Drawing for "Improvement Plans for Hamilton Field Phase One, Novato, CA" October 1997, (Selected Sheets Only).

 

MAPS - Part One

 

MAPS - Part Two

 

24

Geomatrix Consultants, "City of Novato (Levee Raising Project)", Novato, CA, 4 August 2006.

 

25

City of Novato, Record Drawing — Hamilton Levee Seepage Collection Project No. 09¬014.

 

 

 

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download WinZip Download Word Viewer Download Excel Viewer Download PowerPoint Viewer
Last updated: 3/4/2010 8:24:08 AM